pcbai

KiCad design review checklist: schematic and PCB

ERC and DRC tell you when a rule is broken. They don't tell you that the reset pin floats, that the regulator has no output capacitor, or that half of your I²C bus is labelled SDA and the other half SDA1. This checklist covers what an experienced reviewer looks at in a KiCad project before the boards are ordered.

1. Before the review

2. Power and regulators

3. Decoupling and bulk capacitance

4. Pins, pull-ups and interfaces

5. Net naming and connectivity

6. Parts, values and footprints

7. PCB layout and routing

8. ERC, DRC and parity

9. Fabrication outputs

Run this checklist on your design, automatically

pcbai's AI review works through most of this list for you: it reads your KiCad schematic and PCB, triages the ERC, clearance and parity results, and reports each issue with the parts and nets involved. Your files are parsed in your browser. Your first review is free.

Review my KiCad project for free